Use BIM based clash detection solutions and conduct design coordination/review studies and meetings to ensure clash free construction and proper site execution eliminating potential or possible delays resulting from incomplete or uncoordinated designs
Capture, structure and manage hard clashes, soft clashed, accessibility and maintenance-ability issues then monitor them consistently, assign them to the relevant stakeholder until they are completely resolved in due time
Use BIM based clash detection solutions and conduct design coordination/review studies and meetings to ensure clash free construction and proper site execution eliminating potential or possible delays resulting from incomplete or uncoordinated designs
Capture, structure and manage hard clashes, soft clashed, accessibility and maintenance-ability issues then monitor them consistently, assign them to the relevant stakeholder until they are completely resolved in due time