info@aidigits.net

4B Filokyprou Street, 3032 Limassol, Cyprus

Call Us Now ​+306944763735

AIDIGITS

Operation Phase information

AIDIGITS shall make sure of the full handing over delivery from the construction stage, is this phase AIDIGITS shall ensure that the following documents and information are passed properly, accurately, compressively and digitally from the project team, the contractor, the subcontractors, suppliers and manufacturer:

  • Document Lists
  • As-Built Drawings
  • Latest list of FFE and equipment per room
  • Product data sheets (Catalogues)
  • Warranties
  • Operation and Maintenance manuals
  • Necessary spare parts lists per equipment type (medical and non-medical)
  • Preventive maintenance schedules
  • Lists of activities/jobs scheduled to be conducted per equipment type i.e. tasks so as to sustain the facility (maintenance tasks, operational tasks Etc.)
  • Necessary resources per activity/job
  • Emergency Procedure
  • System details: Equipment groups
  • Information about occupational safety and environmental compliance issues
  • Other documents and info related to operations, maintenance and asset management activities

AIDIGITS shall make sure of the full handing over delivery from the construction stage, is this phase AIDIGITS shall ensure that the following documents and information are passed properly, accurately, compressively and digitally from the project team, the contractor, the subcontractors, suppliers and manufacturer:

  • Document Lists
  • As-Built Drawings
  • Latest list of FFE and equipment per room
  • Product data sheets (Catalogues)
  • Warranties
  • Operation and Maintenance manuals
  • Necessary spare parts lists per equipment type (medical and non-medical)
  • Preventive maintenance schedules
  • Lists of activities/jobs scheduled to be conducted per equipment type i.e. tasks so as to sustain the facility (maintenance tasks, operational tasks Etc.)
  • Necessary resources per activity/job
  • Emergency Procedure
  • System details: Equipment groups
  • Information about occupational safety and environmental compliance issues
  • Other documents and info related to operations, maintenance and asset management activities
Company Logo
Maximum file size: 100 MB
Icon1 Icon
Maximum file size: 100 MB
Icon1 Link
Icon2 Icon
Maximum file size: 100 MB
Icon2 Link
Icon3 Icon
Maximum file size: 100 MB
Icon3 Link
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.