{"id":576,"date":"2024-11-12T22:10:21","date_gmt":"2024-11-12T22:10:21","guid":{"rendered":"https:\/\/aidigits.net\/?p=576"},"modified":"2024-11-12T22:10:21","modified_gmt":"2024-11-12T22:10:21","slug":"develop-based-project-controls","status":"publish","type":"services","link":"https:\/\/mc-clients.com\/aidigits\/services\/develop-based-project-controls\/","title":{"rendered":"Develop Based Project Controls"},"content":{"rendered":"<p>AIDIGITS SERVICES DURING THE<br \/>\n<noscript>&lt;br \/&gt;<br \/>\nDESIGN PHASE\t\t\t\t<\/noscript><br \/>\n<!-- close .eael-fancy-text-container --><\/p>\n<p>Aidigits shall work closely with clients\/the client. and the project IT System&#8217;s engineers to develop a BIM based system integration diagram that shall be used to ensure effective creation, storage, manipulation and reporting of the data developed by the different stakeholders.&nbsp;<\/p>\n<p>AIDIGITS shall avail several alternatives for the 3D based data repository that shall be discussed and addressed in due time. One of these applications IS a tailored BIM visualization and data integration platform known as C3D.<\/p>\n<p>C3D Interactive offers a powerful Environment for data querying, manipulation as well as powerful 3D\/4D reporting of information. This power can be leveraged on all the project Construction Systems through the power of C3D Connectors.&nbsp;<\/p>\n<p>C3D Connectors operate on three different levels or flavors. The choice is depending on how open the Target System is, and depending on the available support from target vendors.<\/p>\n<p>This process is very important and critical for the effectiveness and success of the BIM implementation.<br \/>\nAmong the critical systems that need to be integrated within the BIM based digital workflows are:<\/p>\n<p>1<\/p>\n<p>eDMS (Electronic Document Management Solution)<\/p>\n<p>2<\/p>\n<p>CDE (Common Data Environment)<\/p>\n<p>3<\/p>\n<p>Estimation system<\/p>\n<p>4<\/p>\n<p>Budget and cost control systems<\/p>\n<p>5<\/p>\n<p>S\/C management workflow<\/p>\n<p>6<\/p>\n<p>QA\/QC system<\/p>\n<p>7<\/p>\n<p>Planning<\/p>\n<p>8<\/p>\n<p>The WBS, the OBS and CBS (Work Breakdown Structures, Organization Breakdown Structures and the Cost Breakdown Structures)<\/p>\n<figure>\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/mc-clients.com\/aidigits\/wp-content\/uploads\/2020\/10\/BIM-based-Project-Controls.jpg\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/mc-clients.com\/aidigits\/wp-content\/uploads\/2020\/10\/BIM-based-Project-Controls.jpg 642w, https:\/\/mc-clients.com\/aidigits\/wp-content\/uploads\/2020\/10\/BIM-based-Project-Controls-300x179.jpg 300w\" sizes=\"auto, (max-width: 642px) 100vw, 642px\" width=\"642\" height=\"382\"><figcaption>Sample of BIM based Project Controls Integration Diagram<\/figcaption><\/figure>\n","protected":false},"featured_media":2702,"parent":0,"template":"","service-stage":[3],"class_list":["post-576","services","type-services","status-publish","has-post-thumbnail","hentry","service-stage-design-phase"],"_links":{"self":[{"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/services\/576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/services"}],"about":[{"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/types\/services"}],"version-history":[{"count":1,"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/services\/576\/revisions"}],"predecessor-version":[{"id":5023,"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/services\/576\/revisions\/5023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/media\/2702"}],"wp:attachment":[{"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/media?parent=576"}],"wp:term":[{"taxonomy":"service-stage","embeddable":true,"href":"https:\/\/mc-clients.com\/aidigits\/wp-json\/wp\/v2\/service-stage?post=576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}